Temporary Wall, Ceiling and Floor Shoring

Structural stabilization during restoration
Making the Structure Safe to Work In

Fire, prolonged water saturation, impact and soil movement can compromise load-bearing capacity in framing, joists, beams and slabs. Once that happens, no restoration work should proceed until the structure is stabilized. Temporary shoring carries the load safely while damaged members are removed and replaced, protecting crews, occupants, adjacent structures and the remaining undamaged portions of the building.

Engineered Support Systems

Shoring is designed to the actual load path, not improvised. Depending on the condition we install adjustable steel post shores, engineered shoring frames, timber needle beams, wall bracing and floor jacks bearing on adequate sole plates and load-distributing pads. Where the condition or the span requires it, the shoring design is reviewed and stamped by a licensed structural engineer, and installation is coordinated with the demolition and reconstruction sequence so support is never removed before permanent framing is in place.

Monitoring and Removal

Shored areas are monitored for movement, settlement and deflection throughout the project, and shoring is adjusted as loads change during demolition and rebuild. Removal happens only after permanent structural repairs are complete and inspected. You receive the shoring plan, engineering documentation where applicable, installation photographs and a record of monitoring for your project and permit file.

We Cover miles, around 46 cities

Select a location

Choose a city from the tabs above to view its map.